East Anglia One
Transmission Capital Partners were appointed as preferred bidder for the East Anglia One offshore transmission connection ('OFTO') on 22nd December 2020 and took ownership of the assets on the 20th December 2022.
The project includes the offshore substation platform, two submarine cables, onshore cables and onshore substation which connect the 714MW offshore wind farm located 50km off the coast of Suffolk.
The OFTO network connects the windfarm via 123km of twin circuit on and offshore 220kV cables to National Grid’s 400kV substation at Bramford near Ipswich.
This project is the tenth in the Transmission Capital Partners portfolio. The total capital value for the ten projects is in excess of £2.5bn.
.